AIMS Attachment A: AIMS Statement of Work
Page 16 of 130
AIMS 24 hours 7 days a week throughout
testing periods
Maintain a continuous log of AIMS'
performance during testing periods
Provide required AIMS maintenance during
testing periods
Conduct Step I Endurance Testing
Conduct Step II Endurance Testing as
required
Conduct Step III Endurance Testing, if
required
Conduct Step IV Endurance Testing
Make required modification and adjustments
as directed in writing by Contract
Administrator
Complete and pass all phases of Endurance
Testing
Provide finalized Endurance Testing report
and log
Review against
specifications
Complete final project close-out including items
listed below
Review against
specifications
Provide a finalized list and cross-reference of
all supplied documents
Review against
specifications
Complete work site cleaning as required
Provide finalized statement of completion of
work and request for final inspection
Review against
specifications
*Refer to Section 1.6.5 of this Statement of Work for a listing of airlines associated
with each DAPP and CUSS stage
1.6.5 Dynamic Assignment Passenger Processing and Common Use Self
Service Staging
A. The DAPP and CUSS implementations shall be implemented in a staged
manner to accommodate the operational environment at FLL. The airlines
associated with each stage of implementation are provided in the tables
below. All airlines shall be configured, tested, and accepted prior to Final
Acceptance, unless written authorization from the County is obtained.
Table 1.6.5-1: DAPP Staging