Unimark EC3000 Series Dokumentacja Strona 144

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 278
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 143
AIMS Attachment A: AIMS Statement of Work
Page 84 of 130
assignment (depending on the mode of operation). The warnings,
recommendations, and/or re-assignments shall be based on the
defined rule-base and the RMS optimization algorithms.
4. The CONTRACTOR shall provide the knowledge engineering required
to set up the rule-base. The system shall allow authorized users to
change resource constraints and rule definitions.
B. The rule-base shall be an expert system thereby providing easy to define
rules as follows:
1. The rules shall be formatted with sentence-like structure.
2. No programming skills shall be required to define the rule-base.
C. Rules shall be definable for the following:
1. Physical restraints for a resource:
i Resource limits (e.g., gate limitations - location of fuel pits, wide
body gate, narrow body gate, secondary lead-in lines, aircraft
adjacency, and pushback conflicts).
ii Resource closed or out of commission.
2. Carrier considerations:
i Preferred resource for a carrier.
ii Carrier adjacency considerations (two carriers should/should not be
placed adjacent)
3. Ground crew considerations:
i Location of ground handling equipment relative to resource.
ii Location of baggage make-up carousels relative to gate.
4. Passenger convenience (e.g., gate location relative to another gate).
5. Financial considerations (e.g., tow-on/tow-off costs).
6. Off-gate parking location relative to a gate.
7. Flight types (e.g., freight, charter).
8. Resource preference based on various factors:
i Flight arrival/departure time.
ii Flight turn around time.
iii Origin/destination of flight.
iv A flight with multiple flight numbers.
Exhibit 3
Page 144 of 278
Przeglądanie stron 143
1 2 ... 139 140 141 142 143 144 145 146 147 148 149 ... 277 278

Komentarze do niniejszej Instrukcji

Brak uwag